Nd week of november

List nd week of november

  • Stock number:   cccd67 vin:  s miles:   miles showing on the odometer (this vehicle will be sold as mileage exempt) engine:  chevrolet ls3 aluminum ls3 v8 with 430 horsepower  transmission:   tremec...

    $ 72495

  • This was an early z28 and was built over the last week of october and completed in the first week of november at the norwood ohio plant...chevrolet camaro z/28numbers matching early z28 production...

  • The model year was exceptionally long, extending into november , due to manufacturing problem that delayed the introduction of the second-generation model planned for...it was one of camaros with the...

  • Paint                 forest green upper and lower paint trim          795    metallic dark green coated fabric b80   roof drip rail molding b90   door window frame molding 11a            1 st week of...

    $ 10000

  • My next week off is the week of november 12th so, i can deliver it then... i'm also willing to help load on your transporter... i will work with overseas buyers... second owner moved to oregon with the...

    $ 5300

  • Believed to be miles built fourth week of november factory air condition factory t-tops factory power windows factory dark blue with blue cloth deluxe interior nom 350 ci engine automatic transmission...

  • It was built in the third week of november and the car started its life out in michigan with the first owner before gradually making its way to texas...powering the car is the 110hp 6 cylinder corvair...

    $ 125006824291010

  • Rally sport vin n blue/black interior spoiler manual pedals 4 speed console electric windows lay down back seat 10 bolt rear end odo complete break down: 11c = built the third week of november...

    $ 100

  • "¢ built 11e = 5th week of november in baltimore, md..."¢ 12 bolt rear axle housing coded as a cg = 3..."¢ ce chevrolet crate engine built in tonowanda..."¢ date code p7c17 = p (muncie) ) c (march) th...

    $ 49995

  • 64cc heads and winters aluminum high rise intake installed early z28 production, built at norwood in the first week of november bucket seats, center console with gauges, special duct hood, rear spoiler...

  • This particular example was made in buicks flint, michigan factory during the second week of november...get out and drive!!!please click here to view our yourtube video!!!https://youtu...

    $ 33900

Did not find what you're looking for? Try again

Related Searches nd week of november